Checked against official sources in November 2026. Rules change, so follow the links before you act.
One, two, one, two. Sound and power are where community events most often go from 'lovely' to 'can anyone hear me?'. The band plugs in, the burger van fires up its fryer, the outdoor cinema projector warms up, and suddenly everything's sharing one tired generator.
This guide covers the basics of PA, stage and power, the music licence most events need, and the noise rules that decide how loud and how late you can go.
PA and Stage Basics
Match the sound system to the space and the act. A brass band on the green needs very little; a covers band for a crowd of 1,500 needs a proper PA with someone who knows how to run it. Hire a sound engineer with the kit if you can: it's the difference between a crisp set and a muffled one.
Point the speakers away from homes and towards open space where possible, and think about where the crowd will stand. Stages are temporary structures, and HSE normally enforces the building and dismantling of temporary demountable structures, so use a competent staging company and ask for their risk assessment, method statement and insurance.
- Ask your sound supplier for a stage plot and power requirements from every act.
- Plan changeovers and a running order with buffer time.
- Keep a microphone at the stage that's always available for safety announcements.
- Agree who can stop the show, and how, if there's an emergency.
Generators and Power Distribution
Temporary power is not a DIY job. Use a reputable supplier who'll size the generator to your total load, provide proper distribution boards and cabling with protection devices, and set it up, test it and support it on the day. Give them a full list of everything that needs power: stage, traders, lighting, screen, PA, welfare units.
Put generators where exhaust fumes and noise won't bother people, behind barriers, away from tents and not near fuel-free zones like children's areas. Cables should be protected or routed overhead where people walk, and nobody should be daisy-chaining domestic extension leads across the grass.
It's 2pm, the generator has just coughed and the food court goes quiet. Who do you call? Have your power supplier's on-site or on-call contact in the event plan, and decide in advance which loads get priority (PA for announcements, first aid, lighting after dusk).
The Music Licence: PPL PRS
Council licensing and music copyright are different things. Even if your entertainment is exempt from council licensing, playing recorded music in public or staging live music usually needs TheMusicLicence from PPL PRS Ltd. It's a single licence covering both PPL and PRS for Music. Playing music in public without one infringes copyright. You don't need it for royalty-free music.
For one-off events, PPL PRS can arrange a temporary permit for new customers, and existing licence holders (a pub, for example) can add an event to their licence. There's no charity exemption mentioned on PPL PRS's event pages, so plan to pay.
Live events tariffs are based on things like events per year and capacity, or gross ticket sales for some events. PPL PRS has indicated starting points of around 15p per attendee for live performance and 25p per attendee for featured DJ or disco entertainment, but another of its pages says 'from 14p' and prices change. Get a quote rather than budgeting from those figures.
Noise Rules: The Code Councils Use
There's no single national decibel limit for outdoor events, but councils still use the Code of Practice on Environmental Noise Control at Concerts (Noise Council, 1995). Manchester City Council notes it's available free from the Chartered Institute of Environmental Health.
For one to three concert days a year at non-stadium urban or rural venues, the Code suggests a level of 65 dB LAeq over 15 minutes, measured 1 metre from the facade of noise-sensitive buildings such as homes, between 09:00 and 23:00. After 23:00, music shouldn't be audible inside homes with windows open. For urban stadia and arenas the suggested level is 75 dB.
That's guidance, not statute, and many councils set their own conditions through your licence, TEN or land hire agreement. Ask environmental health what they'll expect, and whether they want you to monitor levels on the day.
Curfews: Finish on Time
Many community events run to a curfew written into the licence or hire agreement. Respect it. Build the running order backwards from the curfew, leave slack, and tell the final act firmly in advance that the plug comes out at the agreed time.
Remember the 23:00 line too: several music licensing exemptions only apply between 08:00 and 23:00 (see the licences guide). Going over can mean you've stepped outside the exemption, not just upset the neighbours.
Keeping the Neighbours Onside
A friendly neighbour today is a supporter of next year's event. An ignored one is an objection waiting to happen.
- Letter-drop nearby homes two or three weeks out with dates, times, the curfew and a phone number that will be answered on the day.
- Do sound checks at sensible times and keep them short.
- Walk the boundary during the event and listen. If it sounds loud at the nearest house, turn it down.
- Offer a few free tickets or a thank-you to the closest neighbours.
- Log any complaints and what you did about them.
Organisers ask
Do I need a PPL PRS licence if the music is exempt from council licensing?
Usually yes. The council exemptions cover licensing under the Licensing Act 2003, not copyright. TheMusicLicence is needed to play recorded music in public or stage live music, unless the music is royalty-free.
How loud can my outdoor event be?
There's no single national limit. Councils often use the 1995 noise code, which suggests 65 dB LAeq over 15 minutes at 1 metre from homes for one to three concert days a year at most venues, but your council may set its own conditions.
How big a generator do I need?
It depends on the total load of everything you're powering. Give your power supplier a full list of equipment from acts, traders and site services, and let them size and set up the system.


